Fitted Kitchen Quote Checklist for North Cyprus

Compare fitted kitchen quotes in North Cyprus cabinet by cabinet. Check drawings, hardware, worktops, removal, fitting, currency and handover in writing.

Custom fitted kitchen made in Kyrenia - Perinçek Mobilya

Published:

Ask the carpenter for an itemised quote tied to a dated drawing, with a cabinet schedule, named materials and a list of included and excluded work. Before you compare totals, check who measures, supplies, fits and signs off each part of the kitchen.

Start with the drawing that the price actually buys

Put the drawing revision at the top of the quotation. A layout labelled “kitchen, final” is easy to confuse with last Tuesday’s version, especially if the oven moved after the site visit. Ask for a date, a revision number and a front elevation for each run of units. You should be able to point to the wide drawer under the hob and find that same unit in the written specification. If the drawing shows a fridge behind matching doors, check whether the price covers the cabinet, the appliance or both.

Take a rough sketch to the first meeting. Mark the window opening, the water supply, the waste outlet and any appliance you intend to keep. Photograph the appliance model plate and the room from the doorway. A measurement across the back wall helps the carpenter understand the job, but leave the production dimensions to the person surveying the room. Tiling, a projecting sill or a wall that leans at one end can change the size of the last cabinet.

Ask for a cabinet schedule you can read

A schedule can be short. Give each cabinet a number, its position, its width and a plain description of what goes inside. “B3, below the hob, three drawers” is enough to start a conversation. “B3, three drawers, two deep and one shallow, agreed runner model” is something you can check at handover. Count doors, drawers, internal drawers and shelf sets separately. A wide front that looks like a drawer on a rendering may hide the sink bowl and have no storage behind it.

Specify what happens at both ends of each run. A panel next to a freestanding fridge may be visible from the living room. A similar panel against a wall may serve as a filler that lets the door open. Check which face will match the doors. Ask whether plinths, edges, cover panels and handles are included in the finish you selected. A small labelled offcut of the actual board is easier to match on site than a colour name in a message.

Ask one question about each moving part

Open the sample drawer and imagine lifting your heaviest pan out of its back corner. Ask which runner is priced, how far it extends and whether the supplier’s load rating suits what you plan to store. For hinges, ask whether the chosen model lets an internal drawer clear the open door. Blum, for example, lists separate hinge applications for thick fronts and for wide opening angles. A brand name alone does not specify which fitting the carpenter has allowed for.

Follow the worktop from template to finished edge

Ask who takes the final worktop template and at what stage. A drawing that is accurate enough to price the cupboards may leave the sink detail undecided. Record the worktop material, thickness, edge finish, joints, upstands and cut-outs. Check who supplies the sink and tap and who needs their exact models before making the cuts. Where the top meets an existing tiled wall, agree how the junction will be finished and who will deal with a gap exposed by removal.

For an island, draw the worktop outline as well as the cabinets below. Ask where the seating overhang begins and who specifies any required support. If a stone supplier is doing that part separately, put their task in both sets of paperwork. This avoids paying a joiner for one depth and asking the stone supplier to template a deeper top that nobody has designed the base to carry.

Put the fitting day into the price

A quote may include fitting the cabinets without covering every job needed to cook dinner afterwards. Walk through the room in working order. Who removes the old kitchen? Who takes it away? Who protects the floor, gets the units upstairs and deals with a lift too small for a tall panel? Who reconnects appliances, water and power, and who returns if another trade needs the cabinets left accessible? An item can be included, excluded or awaiting a decision. Give each one an owner.

For a flat in Kyrenia, describe the actual route from the unloading point to the kitchen. A stair turn, a narrow entrance or a building manager’s delivery hours are worth noting before fabrication. At Perinçek Mobilya, on-site measurement and the 3D drawing are free, and delivery and installation are included in the price. The workshop’s own team handles production through installation. Have the project quotation identify any separate trade work and confirm exactly what happens to the old units.

Compare two quotes on the same piece of paper

Write the reference drawing across the top and use one row per decision below. Copy each workshop’s actual wording into its column. An empty cell is a question to take back to that workshop. Do not enter a zero beside an unspecified worktop or removal job. That would make the more detailed quotation look expensive simply because it names the work.

Item to compareWording worth requesting
Cabinet constructionState the material for the carcass, front, visible end and edge
Drawers and hingesGive quantities, model references and any agreed substitutions
WorktopName the supplier for templating, cut-outs, finished edges and fitting
Site workList removal, disposal, access, installation and separate trade work
Commercial termsState currency, tax treatment, validity, payment stages and changes

If you want a budget starting point, the kitchen cabinet cost guide explains the workshop’s per-metre estimate. Use the fitted kitchen service page for the scope of the cabinetry service. To compare actual offers, ask for the total for the same drawing in a stated currency. If payment will be in another currency, agree how the conversion will be calculated and when. Copy the wording into the quote while both sides can still check it.

Agree how changes and handover will work

Before approving production, ask what triggers the start and which selections are still open. An appliance supplied by the owner might arrive after the carpenter needs its technical sheet. Put the model reference, the person supplying it and the date it is needed beside the cabinet number. If you change a drawer bank to doors later, ask for the revised drawing and the written change in price and timing before the changed unit is made. Keep one agreed version accessible to the person meeting the fitters.

A request you can send to a carpenter

“Please price drawing revision B and list the cabinets by number. Include the agreed door finish, drawer runners, worktop edges and cut-outs. Please mark removal, disposal and service connections as included, excluded or to be confirmed, and give the total in the agreed currency. If a selection is provisional, please show the allowance beside that item.” Replace the revision letter with the one on your own drawing.

At handover, walk along the cabinets with the schedule. Open each door, pull the drawers out and check that the agreed handles and visible panels match the sample. Mark any outstanding adjustment against its cabinet number, name the person handling it and agree how you will both confirm completion. Keep the finish reference and the hardware list with the drawing. If one hinge or front needs attention later, those few lines tell the carpenter exactly which part of your kitchen you mean.

Frequently asked questions

What should a fitted kitchen quote include?

Ask for a dated drawing, cabinet schedule, finish and hardware references, a worktop specification, site work, exclusions, currency and payment stages. Each item should have a named supplier or installer.

Can I compare two kitchens by price per metre?

A per-metre figure can give you an early budget. Compare final offers using the same drawing, cabinet quantities, hardware, worktop details and site work. Mark every missing item for clarification.

Does installation include plumbing and electrical work?

Ask for a written list. At Perinçek Mobilya delivery and cabinet installation are included. The project quote should specify who handles appliance connections, plumbing, electrical work and removal.

Which appliance information does the carpenter need?

Provide the exact model reference and installation sheet for each fitted appliance. Include any existing machine you intend to keep and say who will supply its door fixing kit if one is required.

How do I record a change after approving the drawing?

Identify the affected cabinet, request a revised drawing and record the agreed change to price and timing. Both parties should approve the same revision before the changed part is made.

Sources

  • Blum: CLIP top BLUMOTION, hinge applications by front and opening type (checked 23.11.2026)
  • Blum: MOVENTO runner range, extension and load classes (checked 23.11.2026)

For your own kitchen, send us photos and rough measurements on WhatsApp. On-site measuring and the 3D drawing are free.

Kitchen Cabinets · What Affects Kitchen Cabinet Prices in North Cyprus?

Contact us